Skip to the seven steps

A workshop of four

Kvoesco

hello@kvoesco.com

Kvoesco · Siena The Method Seven Steps · One Order

The Methodin Seven Steps

Every job we take on, a single kitchen wall in Asciano or the vault of a private chapel near Montalcino, follows the same seven steps in the same order. Nothing is skipped because a job is small, and nothing is hurried because a date is close. Here they are as we would explain them standing at your wall, from the pits in our yard to the visit two weeks after the last coat, each with its drawing and, where it has one, its price.

The seven steps

From the Pit in the Yard to the Last Visit

The same order for a farmhouse kitchen and a chapel vault. The numbers match the leader lines on the wall cross-section on the front page.

Plate 1
Feb. 2011 Water Putty Earth
The oldest pit in section: putty under its skin of water, the slaking hoe, and the board Tommaso lettered in February 2011.

Every wall starts in the yard behind the bottega, not on the scaffold. We slake quicklime ourselves: water into the tub first, the lumps in after, then a long hoe and a lot of stirring while it spits and boils. The milk of lime runs through a sieve into the pits, settles, and stays there under a skin of water for at least 36 months before any of it goes near a wall.

Ageing is the whole point. Young putty is short and lean and cracks as it dries; three-year putty is fat, slow and smooth as cream under the trowel, and it sets into a harder, more open stone. We do not lay anything younger, which is one honest reason our lead time runs to months.

The oldest pit was slaked in February 2011, in drums in the old cellar in town, and came across the city with us in 2013. Its board still says so in Tommaso's handwriting. The putty in it is now so fine that we use it only for the faces in frescoes, a bucket at a time.

Sand comes from the river, washed and graded: coarse for the rough coat, fine for the last. We mix by hand and by volume, and judge the mix the old way, between thumb and finger.

  • 36 months at least
  • Slaked ourselves
  • Oldest putty Feb. 2011

Plate 2
Hollow Salt line Raking light Mallet
A survey drawn as we draw them: every tap point on the grid, the hollow ringed where the mallet sounded like a drum, salts below the tide line.

Before we quote, we come and look. Livia or Tommaso spends a morning at the wall, less in a kitchen, longer in a chapel. We tap every part of it, first with knuckles and then with a small wooden mallet: sound plaster gives a dull knock, plaster that has come away from the stone rings hollow. Each hollow goes onto a drawing, never onto the wall itself.

Then the salts. A white bloom, a powdery band at knee height, paint blistering in a line: that is water rising from the ground or running in from a gutter, carrying salts that crystallise in the plaster and push it off. We map where it stops, because no new lime will last until the water is dealt with.

Last comes raking light, a lamp held low at the side so that every blister, old patch and buried line of an earlier painting throws its own shadow. A painted edge under whitewash usually shows itself this way first, late in the day.

You receive a written condition report with photographs and drawings, and a fixed quote. The survey is €180 within 40 km of Siena and is credited in full against the job if you go ahead; surveys are usually booked within three weeks of first writing. For listed walls, the report, drawings and photographs are the papers usually asked for. Arranging the permission itself sits with the owner.

  • Survey €180 within 40 km
  • Credited in full
  • Booked within 3 weeks
Write for a survey

Plate 3
Cement, 1970s Old lime, kept Stone and lime mortar
Cement render coming away from a rubble wall under bolster and hammer. Where it never bonded, the original lime coat is still there behind it.

Most walls we are called to are not suffering from age. They are suffering from the last repair: a cement render put on in the 1970s, cement pointing raked into lime joints, a gypsum skim, three coats of plastic paint. Each one seals the wall, and a sealed wall keeps its water inside, where it does the damage.

All of it comes off by hand: lump hammer and bolster for render, plugging chisels for cement joints, scalpels for paint. Never a grinder. A grinder cannot tell cement from the old lime underneath, it scores the face of the stone, and it fills a house with a dust nobody should breathe.

Taken slowly, cement that never bonded often lets go in whole sheets, and the old lime behind it is sometimes still sound. What is sound we keep, consolidate and plaster over. What is soft and salted goes back to the stone.

Then the wall is brushed down dry and left open to breathe for as long as it needs: days in a dry summer, weeks in a damp chapel. Small areas of historic plaster that only need mending are patched instead, charged by the conservator-day.

  • Hand tools only
  • Sound old lime stays
  • Patch repair €420 per conservator-day

Plate 4
Bare stone 10-15 mm In section Arriccio, scratched for key
The rough coat going over bare rubble, scored with a comb of nails while still green. The detail shows its depth against the stone.

The wall is wetted the evening before and again in the morning, so the stone does not drink the water out of the new lime. Deep holes and open joints are packed first with lime, sand and pieces of old brick and tile, and a thin first coat is thrown on hard from the trowel so it grips every hollow.

Over it goes the arriccio: 10 to 15 mm of aged lime and coarse river sand, laid with the trowel and ruled with a straight edge as far as an old wall allows. We follow the wall's own curves rather than forcing it flat. A farmhouse that leans should still look as though it leans.

While the coat is still green we score the whole surface with a comb of nails set in a lath, so the fine coat above has something to hold. Then it is left to firm up for several days, misted if the weather is dry.

This is the coat that sets the price of new plaster. Three coats on old stone or brick cost €72 to €98 per m², and where a wall falls in that range depends on how far out of true it is, and how much the arriccio has to make up.

  • 10-15 mm thick
  • Coarse river sand
  • €72-98 per m², three coats

Plate 5
Day 1 Day 2 Today Tomorrow
A lunette laid in days. Each seam runs along a line the eye already expects: the halo, the edge of the robe. The rough coat at the sides waits for tomorrow.

The intonaco is the skin: a few millimetres of fat, three-year putty and fine sand, laid over the damp arriccio and closed with the trowel until it shines. Lime only takes pigment, and only binds well to the coat beneath, while it is wet. So we lay only as much as can be finished that day, the giornata, and not a hand's breadth more.

At the end of the day whatever cannot be finished is cut back at a slant to the arriccio, and the edge goes where nobody will look for it: along a cornice, into the shadow of a beam, round the outline of a figure. Next morning's plaster is pressed up against that bevel.

On an old fresco you can still count the painter's days this way, if you know where to look. On our plain walls you should not be able to find one.

Where a wall is to be coloured, lime wash in natural earth pigments goes on in two coats over the cured plaster, thin as milk, and dries several shades paler than it goes on. It costs €24 to €32 per m².

  • One day's area at a time
  • Edges hidden on a line
  • Lime wash €24-32 per m²

Plate 6
Lime grout Poultice Tratteggio
The loss is filled level and infilled in fine vertical strokes that read as tone from across the chapel and as plain hatching up close.

On a painted wall we work slowest of all, and Grazia leads. Cleaning starts dry, with soft brushes, and moves to damp poultices of paper pulp laid on the surface and left to draw dirt and salts out as they dry. Every method is tried first on a patch the size of a stamp, in a corner nobody looks at.

Where the painted plaster has lifted away from the wall, we hold its face with thin paper, flush the hollow behind and inject lime grout through a syringe, a little at a time, easing the plaster back with a padded board until it sets.

Losses are filled with lime to just below the paint, then infilled in tratteggio: fine vertical strokes of pure colour that read as one tone from a few steps away and as plain lines from close up. Anyone who looks can see what is ours. Lost faces and figures are never repainted from imagination; where nobody can know what was there, the plaster is left honest.

Cleaning and consolidation cost €700 to €1,600 per m², fixed in writing after the survey. Tratteggio is charged at €55 an hour at the wall.

  • Cleaning €700-1,600 per m²
  • Tratteggio €55 an hour
  • Patch tests first
The Saint Lucy near Murlo

Plate 7
New plaster Fine mist Misted daily, 7 days 1234567 Return +14 Days later
A week of mist on new interior plaster, then a gap, then the visit that decides whether the job is finished.

Lime does not dry so much as turn back into stone, taking carbon dioxide from the air, and it does it slowly. Dry it too fast, with a heater, a through draught or a June sun, and it cracks and dusts. So for 7 days after laying, one of us comes to mist interior plaster every day, and we ask you to keep the windows as we leave them that week.

Outside, the weather decides. We lay exterior lime only from April to October, never below 5 °C and never with a frost in the forecast. Crews start at 7:30 all year, and from June to August they stop at 16:30 because of the heat.

Two weeks after the last coat we come back, tap the wall again under raking light, look for hairlines and soft spots, and put right anything that needs it. Only then do we ask for the final 10%.

It is also why we turn down fast-track jobs. A wall that skips its seven days will tell you so within a winter, and we would rather lose the job than lay that wall.

  • Misted 7 days
  • Return after 2 weeks
  • Final 10% after the check
In practice

What Seven Steps Mean for Your Calendar

Aged putty, one day's plaster at a time and a week of curing cannot be hurried. These are the numbers that follow from them.

From signed quote to first day

14-20weeks

Our current lead time. The survey itself is usually booked within three weeks of your first message, and costs €180 within 40 km, credited against the job.

Rates & Terms
Exterior season

Apr-Oct

Outside lime work only in these months. Interior work goes on through the year, apart from the Christmas closure from 23 December to 7 January.

The season strip
Smallest job

€840

Two conservator-days is the minimum. We travel up to 120 km from Siena; beyond 40 km travel is €0.55 per km, and overnight stays at cost.

Write to the bottega